检查计划的成功常青化对于确保资产可用性、机械完整性、代码遵从性和变更的核算至关重要。必须考虑和评估每一项新资产、维修、工艺变更、检查或偏移,以确定其对机械完整性(MI)计划的影响,并确保基于风险的检查(RBI)正确模拟可能出现的损坏和风险。必须有可靠地提供一致的常青结果的过程和程序,员工必须致力于常青过程。本文将描述业主-用户的长期绿化过程,以维护准确的数据,以支持MI计划,并协助规划检查、周转、维修、更换和升级。
In this particular case, evergreening involved the long-term support of the site's RBI program through continuous updates to risk analysis inputs following modifications to the facility’s assets via management of change (MOC) and/or maintenance programs, changes in operating practices, as well as in response to any new findings resulting from both routine and large-scale inspection work. In layman's terms, evergreening is the process of ensuring your inspection data management system (IDMS) matches what is physically in the field and correctly models the processes contained in those assets. An RBI program must be constantly updated as changes to assets and processes occur.
常青的重要性
以印度储备银行为基础的经常绿化检查计划的重要性是多方面的。如果没有更新资产和流程信息,资产将面临不可预见的损坏风险,从而导致计划外停机。压力容器的完整性对人员的安全以及工艺装置的持续运行/可靠性至关重要。代码要求资产检查程序适当地记录并更新。一个强大的常青过程确保这些关键文档是最新的和相关的。
IDMS和记录文件的健康和完整也是至关重要的。evergreen可确保IDMS反映实际情况,并正确建模可能发生的过程和损坏机制。不断更新的过程……
评论和讨论
添加一个评论
请登录或188abc金博宝 参与评论和讨论。